ilmscore | Why did this PSU stock go up by 26% in one month? #shorts

Predictions from this Video

Total: 2
Correct: 0
Incorrect: 0
Pending: 2
Prediction
Topic
Status
India's power generation capacity is expected to increase threefold to 300 GW within the next 6 years.
"in the next 6 years, this number is expected to increase threefold to 300 GW."
India's Power Generation Capacity
Pending
Most future loans for power capacity expansion are predicted to be allocated to the renewable energy sector.
"most of the loans will go to the renewable sector."
Renewable Energy Loan Allocation
Pending